Overview
Services that are added after the structure is built are usually forced through the wrong places. Coordinating MEP with the architectural and structural design from the start keeps shafts, risers, and openings where the building can accommodate them.
A building's services (power, lighting, water supply, drainage, ventilation) pass through the same walls, slabs, and shafts that the architect and the structural engineer are designing. MEP design plans these systems together with the other two so that pipes, ducts, and cables have a route, and so that openings through beams and slabs are known before the concrete is poured.
When you need it
- You are planning a new building and need electrical, water supply, and drainage drawings.
- The architectural and structural drawings are in progress and service routes need to be coordinated with them.
- You need load calculations to size the electrical supply or water systems for a building.
- You want construction-ready service drawings that the contractor can price and install from.
What's included
- 01
Electrical design
Load calculations, power and lighting layouts, and distribution drawings.
- 02
Plumbing design
Water supply and sanitary drainage layouts, with riser and shaft positions coordinated with the plan.
- 03
Mechanical systems
Ventilation and mechanical service layouts coordinated with the architectural and structural design.
- 04
Coordination with architecture and structure
Openings, shafts, and sleeves located so that they do not conflict with beams, columns, or slabs.
How it works
- 01
Review the design
The architectural and structural drawings are reviewed for service routes, shafts, and plant space.
- 02
Calculate loads
Electrical, water, and drainage loads are worked out for the building's use.
- 03
Lay out the services
Routes, risers, and equipment positions are drawn and coordinated with the other disciplines.
- 04
Issue drawings
Construction-ready drawings are issued, and revised if the architectural or structural design changes.
What you receive
- Service layouts
- Plan layouts for electrical, plumbing, and mechanical systems.
- Load calculations
- Calculations behind the sizing of the services.
- Construction-ready MEP drawings
- Drawings the contractor can price and install from.
Codes & inputs
- Architectural and structural drawingsCurrent plans, sections, and structural layouts for the building.
The scope of MEP work depends on the building type and use. Confirm what is included before the design starts.
Questions about mep design
Why should MEP be designed together with the structure?
Pipes, ducts, and cables need openings through beams, slabs, and walls. If those openings are known while the structure is being designed, they can be placed where the structure can take them, rather than being cut through reinforced concrete on site.
What drawings does MEP design produce?
Service layouts for electrical, plumbing, and mechanical systems, the load calculations behind them, and construction-ready drawings the contractor can price and install from.