Planning
Things to Settle Before You Start a Building Design
Land papers, the approving authority, a survey, a soil test, the final number of floors, a brief, and a budget. Settling these early saves redesign, delay, and money later.
Plain explanations of the decisions owners face before and during a building project: what to check, what to prepare, and what the reports and rules mean for your site.
Planning
Land papers, the approving authority, a survey, a soil test, the final number of floors, a brief, and a budget. Settling these early saves redesign, delay, and money later.
Soil & Foundations
A soil investigation measures the ground your building will stand on. Here is what the field work involves, how to read the report, and the mistakes that lead to foundation problems.
Assessment & Retrofitting
Before another floor goes on, the foundation, columns, and materials of the existing building have to be checked against the new loads. Here is how that check works and what it can conclude.
Approvals
Many approval delays start with missing papers or drawings that break the rules. This checklist covers the land documents, drawings, and reports an application usually needs.
Structural Design
Reinforced concrete suits most homes and apartment buildings. Steel often suits factories, warehouses, and long spans. Here is how engineers weigh the two for a building in Bangladesh.
These articles are general guidance. Every site is different, so treat them as a starting point for a conversation with an engineer, not as a design.