Architectural render of a ten-storey dyeing building with brick and glazed facade and planted balconies, Savar
Industrial

G+9 Dyeing Building, Savar

A ten-level industrial building for dyeing operations in Savar, Dhaka, with a floor area of 31,000 sq ft.

Location
Savar, Dhaka, Bangladesh
Type
Industrial building
Floor area
31,000 sq ft
Buildings
1

Overview

A G+9 industrial building for dyeing operations in Savar, Dhaka. It uses a dual structural system of intermediate moment frames and special RC shear walls.

Design approach

A ten-level industrial building needs lateral stiffness as much as vertical strength. The design combines intermediate moment frames with special RC shear walls so the building resists earthquake and wind through two load paths. In a dual system the intermediate moment frame and the special RC shear walls share the lateral load, so the walls take most of the sway while the frame keeps carrying gravity load and adds ductility.

  • Dual system: intermediate moment frame with special RC shear walls
  • Ten levels (G+9) with 31,000 sq ft of floor area
  • Designed for soil type SD and seismic zone 2
G+9
Storeys
31,000 sq ft
Floor area
SD
Soil type
Zone 2
Seismic zone
Dual system
Structural system

Design & engineering

How the disciplines come together

01

Structure

Design basis: soil type SD, seismic zone 2. Lateral load resisting system: dual system of intermediate moment frames and special RC shear walls. Site class SD describes the soil profile used to set the earthquake loading. It comes from the soil investigation for the plot. Seismic zone 2 sets the base earthquake coefficient in BNBC 2020.

Building breakdown

What is being built

Dyeing building

Dyeing and industrial processing

Storeys
G+9
Floor area
31,000 sq ft

Ten-level RC building with a frame and shear wall system.

The next step

Planning something similar?

Tell us about the site and the brief. We can explain how planning, structure, and approvals would be coordinated for your project.